![QSI QS-2plus! Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/qsi/qs-2plus/qs-2plus_manual_3303981007.webp)
7
Setting Up
This section describes the equipment you need for faultless operation of
QS-2+.
The
MORE
sections throughout this manual explain how to get even better
performance from your QS-2+. It is not required that you read these sections, but we
thought many of you would appreciate the additional information.
Equipment List
You will need—
••
A layout or a long length of straight track in front of you
••
An engine with the QS-2+ system installed
••
A transformer with a Horn or Whistle Button
••
A Bell Button is necessary for Passenger/Freight Announce-
ment, Engine Plus, turning the diesel warning light on and
off,
and some Brake and Flange sound operations.
Note:
If you are familiar with running QS-1
, QS-2
or MTH®
ProtoSound
, you can operate your QS-2+™ equipped engine as you would
these other systems. If you are not familiar with QSI products, please read on
before starting your engine.
1
Содержание QS-2plus!
Страница 1: ...QS 2plus Sound and Control for 3 Rail Reference Manual...
Страница 2: ......
Страница 73: ...Section 6 RESET Feature Guide u 73...
Страница 140: ......