Operating Instructions
TM-150-D-A-XL
Operation
24 / 47
V1
GB
3.) Put up the boom jib about approx. 45 °. (
Ill. 3).
4.) Pull at the cord (
) to release the locking lever at the
gear ring (on the
boom jib
).
Ill. 3
Ill. 4
5.) Swing the boom jib complete out (
Ill. 5), untill the rear
and front part are in the same line.
6.) Pull at the cord (
) to lock the locking lever at the gear
ring (on the
boom jib). Therefore the boom jib is stiff. (
Ill.
6 see
)
Ill. 5
Ill. 6