4
OPERATING INSTRUCTIONS
4.1
OPERATING POSITION AND CONTROLS
A
‐ Carriage R travel control lever
B
‐ Fork swing control lever
C
‐ Fork lifting control lever
D
‐ Carriage L travel control lever
E
‐ 2nd travel speed lever
F ‐
Vakuum
19
O
O
P
P
E
E
R
R
A
A
T
T
I
I
O
O
N
N
A
A
N
N
D
D
M
M
A
A
I
I
N
N
T
T
E
E
N
N
A
A
N
N
C
C
E
E
M
M
A
A
N
N
U
U
A
A
L
L
TP2000
MUTP2000171893021216
07063600
AKUU
E
B
D
C
A
F