Operating Instructions
TM-150-D-A-XL
Operation
23 / 47
V1
GB
2.) To install (lift up) the boom jib press the control button
“backwards” (in direction to the operator).(
Ill. 2 +2A+3)
Ill. 2
Ill. 2A
Alternative: use automatic operation
When the selector switch is on position "
Auto
", the
boom jib moves "automatically" to the top. (see
figure alongside „Ill. 2B“)
While using the automatic operation is the stay of
persons in the working area forbidden.
Danger of injury!
To stop the automatic operation move the selector
switch at the control lever to the position "Hand"
Ill. 2B