Operating Instructions
TM-150-D-A-XL
Operation
18 / 47
V1
GB
Pos: 16 / 99 geräte spez. Module /PG2 Vakuum -Verlege syst eme/Tra ns M obil (TM-15 0-D- A-XL 5222. 0003)/TM 15 0-b_5222.0003_Be die nung @ 3\m od_1285 06003 6801_2. doc @ 31163 @ 1222234334432
5
Operation
5.1.1
Starting the Diesel engine
Every emergency symbol and its corresponding explanation (icons) has to be read and understood before
putting the device into operation in order to secure the user and the device.
Read unconditional the attached operating instructions of the
diesel engine HATZ-
–
1D81C
and the
tracked
forklift HINOWA - TP2000
!
Before every first start-up, check the oil level and if necessary refill oil.
Ill. A+B. (see attached operating
instructions „Hinowa“)
.See also further maintenance instructions in the manuals of the
diesel engine HATZ-
–
1D81C.
Ill. A
Ill. B
1.) Control daily the oil level.
Pull out oil level gauge.
(
Ill.C)
2.) Check daily air filter for dirt and clean if necessary (
Ill.D)
Ill. C
Ill. D