Operating Instructions
TM-150-D-A-XL
Operation
22 / 47
V1
GB
5.3
Installing the boom jib
Before the diesel engine can be started, move
first
the selector switch at the control unit to the
position "
Hand
" (and left it in this position).
(
Ill. 0)
Ill. 0
1.) To install the boom jib, start the HATZ Diesel engine. (see
chapter „Starting the Diesel engine“). (
Ill. 1)
Ill. 1
Ill. 1A