STEP 2: ROOF PEAK SUPPORT
1:FIND ONE 5/4 X 6 X 10" ROOF PEAK SUPPORT FROM THE 1503 BOX. LAY THE ROOF SECTION
LEFT AND THE ROOF SECTION RIGHT ON A FLAT SURFACE. ALIGN THE ANGLED ENDS FLUSH WITH
ONE ANOTHER.
2: PLACE THE ROOF PEAK SUPPORT ON TOP OF THE ROOF SUPPORTS, MAKE SURE THE ROOF
PEAK SUPPORT TOP EDGES ARE FLUSH AGAINST THE BOTTOM FACE OF THE ROOF SECTION
BOTTOM BATTEN. FASTEN USING FOUR #8 X 2" WOOD SCREWS THROUGH THE PRE DRILLED
HOLES INTO THE ROOF SUPPORTS.
(FROM 1503 BOX)
ROOF SECTION RIGHT
5/4 X 6 X 10" ROOF
PEAK SUPPORT
ROOF SECTION LEFT
#8 X 2" WOOD SCREW
ROOF SECTION BOTTOM BATTEN
14
Содержание 1501
Страница 7: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 47: ...1 2 PICTURE DESCRIPTION QTY TELESCOPE 11 4012 HANGERS 07 0001 28 0001 IRON DUCTILE SWING BRACKET 6 37 ...
Страница 48: ... PAIR CLIP 07 0005 SPRING 11 5013 BRACKET GREEN 11 4003 6 9 90 SAFETY HANDLES 2PR DESCRIPTION PICTURE QTY 38 ...
Страница 117: ...PART 2 CLATTER BRIDGE ASSEMBLY 107 ...
Страница 153: ...APPENDIX 143 ...
Страница 155: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 156: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 157: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...