STEP 23: DRILLING CORNER POST HOLES
1: CHECK THE DIMENSION OF THE ROOF SUPPORT ASSEMBLIES AS SHOWN BELOW BEFORE
DRILLING HOLES.
2: MEASURE AS SHOWN BELOW AND MAKE MARKS ON THE CORNER POSTS ON THE
INSIDE.
3: DRILL A 9/64" HOLE BY 2-1/2" DEEP AT EACH MARK.
4: REPEAT SUBSTEPS 2-3 ON THE INSIDE OF THE OTHER POSTS
AS POINTED OUT BELOW.
REPEAT THE
MEASURE/MARK/DRILL
PROCESS ON THE
INSIDE OF THESE
CORNER POSTS.
USE 1-7/8"
FOR GREEN POSTS.
STAINED
16
1"
POSTS
"
1"
1 13
33 38 "
33 7
16 "
130
Содержание 1501
Страница 7: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 47: ...1 2 PICTURE DESCRIPTION QTY TELESCOPE 11 4012 HANGERS 07 0001 28 0001 IRON DUCTILE SWING BRACKET 6 37 ...
Страница 48: ... PAIR CLIP 07 0005 SPRING 11 5013 BRACKET GREEN 11 4003 6 9 90 SAFETY HANDLES 2PR DESCRIPTION PICTURE QTY 38 ...
Страница 117: ...PART 2 CLATTER BRIDGE ASSEMBLY 107 ...
Страница 153: ...APPENDIX 143 ...
Страница 155: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 156: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 157: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...