5/16" WASHER
TOP BRIDGE RAIL
5/16" X 3-1/2" LAG SCREW
LOWER BRIDGE RAIL
59" CORNER POST TO CORNER POST
16" TOP OF TOP RAIL
TO BOTTOM OF
LOWER RAIL
STEP 16: MOUNTING BRIDGE RAILS TO FORT
1: PLACE THE BRIDGE RAILS AGAINST THE GREEN CORNER POST AND CENTER POST ON
THE PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X
3-1/2" LAG SCREWS AND 5/16" WASHERS.
3: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS USING THE 16" DIMENSION
AT THE FORT AS SHOWN ON STEP 15 AND BELOW. ATTACH EACH LOWER BRIDGE RAIL
WITH 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
123
Содержание 1501
Страница 7: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 47: ...1 2 PICTURE DESCRIPTION QTY TELESCOPE 11 4012 HANGERS 07 0001 28 0001 IRON DUCTILE SWING BRACKET 6 37 ...
Страница 48: ... PAIR CLIP 07 0005 SPRING 11 5013 BRACKET GREEN 11 4003 6 9 90 SAFETY HANDLES 2PR DESCRIPTION PICTURE QTY 38 ...
Страница 117: ...PART 2 CLATTER BRIDGE ASSEMBLY 107 ...
Страница 153: ...APPENDIX 143 ...
Страница 155: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 156: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 157: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...