G 03533 - Edition 04 - August 12
1/2
E 15
Conditioning the pump for shipping
Preparing the pump
for expedition
Water line must be drained to avoid hoses freezing up during
shipment (
E 12
).
Pumps that are to be shipped must first be pressurized with dry
nitrogen (
E 11
).
Install the connections provided with the pump when it was first
delivered. Contact the service center for components if necessary.
Inlet connecting accessory
DN 50 ISO K
DN 100 ISO-K DN 160 ISO-K
Inlet blank-off flange
106314
090467
104456
Equipped centering ring with
1/8 gas connector
087168
068349
068186
Double-claw clamps (set of 4)
-
303056
303057
1/8 gas connector
082981
082981
082981
Claw clamp
303003
-
-
Exhaust connecting accessory
DN 40 IS0-KF
Inlet blank-off flange
068197
Equipped centering ring
068230
Releasable clamp
303002
You must have a supply of dry nitrogen to pressurize the pump.
B 40
for the dry nitrogen’s characteristics.
Block the inlet port with the flanges supplied.
Connect the nitrogen to the gas connector.
– Pressurize the pump with dry nitrogen to a relativ pressure of
200 hPa.
– When the nitrogen flows out of the exhaust, seal it shut with the
accessories provided.
– Disconnect the nitrogen supply.
Seal the inlet and
exhaust
Pressurizing
the pump
Study the safety instructions for pump relocation before disconnecting
the pump (
E 11
).
Whenever you return the product to an adixen repair service center, please
make sure you follow the «procedure for returning products « and fill in the
declaration of contamination found at the end of the operating instructions
or on our website.
Fill in the declaration of contamination ................................
G 200
G 200
adixen Vacuum Products - A3H Series Operating instructions