English
Electric wire rope winch >BETA< SILVERLINE
04.01.401
technische Änderungen vorbehalten
design changes under reserve
changements techniques sous réserve
Seite / page 16
Before taking into operation, please carefully
read this operating instructions.
Observe the safety instruction!
File documentation!
Destined use
The electric wire rope winch >BETA< SILVERLINE
is a power operated winch fixed to a console for
lifting and lowering of loads.
Not suitable for use in explosive danger area.
Not suitable for use in corrosive atmosphere.
Alterations to the winch or fitting of accessories are
only allowed with our written approval.
Pay attention to the technical data and
functional description!
Regulations for the prevention of
accidents
Observe any rules which are valid for the respective
country.
1
)
Presently valid in Germany:
UVV BGV D8 winches- lifting and pulling devices
UVV BGV D6 crane
UVV BGR 500-2.8 load suspension devices in hoist operation
DIN 15020 page 1 and page 2
VDE 0100 T 726;
EN 60204 T1 Electrical equipment of machines
EN 60204 T32 Electrical equipment of machines-hoists
EC directive 98/37/EC
FEM 9.661, ISO 4308/1, ISO 4301/1
FEM 9.775, FEM 9.511
1
)
in the respective version
Safety instructions
Operation, installation and maintenance work
should only
be executed by:
Competent, qualified persons
(definition of experts acc. to IEC 364)
Qualified persons for reasons of their training, experience and
instruction are persons who do their necessary activities
without danger and who can avoid this danger due to their
knowledge of directives, regulations for the prevention of
accidents and standards. These persons are responsible for
the security of the installation.
Moving of people by the winch or staying in danger
zone is forbidden.
Moving of loads over people is strictly forbidden.
Never touch moving parts.
Defects must be repaired immediately by competent
trained personnel.
The load
Ö
must not be left suspended without supervision,
Ö
must not be allowed to swing
Ö
must not fall into the wire rope
Ö
must not be operated in areas which cannot be
overlooked. It must be possible to overlook the entire
lifting area.
The rope
Ö
should
only
be used for lifting, lowering or pulling of various
loads and must not be used for any other
purpose
Ö
when filled to its capacity the drum
flanges must project not less than 1.5-
times the diameter of the rope
Ö
examine and service regularly acc. to DIN
15020 page 2
Ö
in lowest position at least 3 full turns of
rope should remain on the drum when
loaded
Ö
fleet angle (see picture)
for standard wire rope
≤
3°,
for special rope
≤
1,5°
Ö
do not touch the rope inlet
Ö
only handle with safety gloves
Ö
slowly position the slack rope to the load
The winch
Do not exceed the capacity of each rope layer.
Before taking into operation, a competent person
must check:
Ö
the lifting device
Ö
the load bearing parts of the structure
Ö
the carrying medium
Ö
mounting
Electric parts
The electric connection or repair on electric parts
may only be executed by trained experts.
Observe the safety regulations and standards of
electrical engineering.
Works on the electric installation may only be
executed with cleared power supply.
Daily examinations
Ö
functional switch UP - DOWN
Ö
limit switch (if existing)
Ö
Emergency stop
Ö
main switch
Ö
El. overload safety device (if existing). Definitely
required for lifting capacity of 1000kg and more.
Ö
control
Ö
brake function (motor-brake)
Ö
condition of the rope and loading device
Ö
load bearing parts of the structure
Ö
the load carrying medium
!
1,5°
3. 2. 1.
1,5°
3°
3°