![Peterbilt 325 2017 Скачать руководство пользователя страница 237](http://html1.mh-extra.com/html/peterbilt/325-2017/325-2017_operators-manual_1532227237.webp)
PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
Recommended PM
Interval
SYSTEM
COMPONENT
MAINTENANCE TASK
I
A
B
C
Pitman arm clamp bolt and
nut
Check the torque; tighten to specified torque value as required.
X
Steering intermediate shaft
Check the torque on the pinch bolt and nut.
X
Steering intermediate shaft
U-joints (ON HIGHWAY)
Lubricate [EP NLGI #2 HD grease, +325° F to -10° F (+163° C
to -23° C) range].
X
Steering intermediate shaft
U-joints (OFF HIGHWAY or
CITY DELIVERY)
Lubricate [EP NLGI #2 HD grease, +325° F to -10° F (+163° C
to -23° C) range].
X
Draglink and tie rod arm ball
sockets (ON HIGHWAY)
Lubricate (EP NLGI #2 lithium-based, moly-filled, HD grease).
X
Power
Steering
Draglink and tie rod arm ball
sockets (OFF HIGHWAY or
CITY DELIVERY)
Lubricate (EP NLGI #2 lithium-based, moly-filled, HD grease).
X
(03/17)
Y53-6060-1C1
5-27
5
Содержание 325 2017
Страница 1: ......
Страница 2: ......
Страница 3: ...348 337 330 325...
Страница 4: ......
Страница 5: ...Contents Safety Emergency Controls Driving Maintenance Information Index 1 2 3 4 5 6 7...
Страница 44: ......
Страница 66: ......
Страница 140: ......
Страница 144: ......
Страница 217: ...MAINTENANCE Clutch Adjustment Normal Wear 5 157 Automatic Transmissions 5 158 03 17 Y53 6060 1C1 5 7 5...
Страница 218: ......
Страница 298: ...ELECTRICAL Fuse Panel Door 5 88 Y53 6060 1C1 03 17 5...
Страница 299: ...ELECTRICAL Fuse Panel Label 03 17 Y53 6060 1C1 5 89 5...
Страница 370: ......
Страница 391: ......
Страница 392: ......