PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
Recommended PM
Interval
SYSTEM
COMPONENT
MAINTENANCE TASK
I
A
B
C
Total Vehicle Alignment
Check and adjust as required.
X
Steering knuckle spindles,
thrust bearings, kingpins,
drawkeys, tie rod ends,
steering stops, & bushings
Inspect for wear and damage and endplay. Shim or replace as
required (shown on page 5-138).
X
Kingpin bushings, thrust
bearings, & tie rod ball ends
Lubricate with approved grease.
X
Front Axle
(Meritor)
Drawkeys
Tighten nuts
X
X
5-14
Y53-6060-1C1
(03/17)
5
Содержание 325 2017
Страница 1: ......
Страница 2: ......
Страница 3: ...348 337 330 325...
Страница 4: ......
Страница 5: ...Contents Safety Emergency Controls Driving Maintenance Information Index 1 2 3 4 5 6 7...
Страница 44: ......
Страница 66: ......
Страница 140: ......
Страница 144: ......
Страница 217: ...MAINTENANCE Clutch Adjustment Normal Wear 5 157 Automatic Transmissions 5 158 03 17 Y53 6060 1C1 5 7 5...
Страница 218: ......
Страница 298: ...ELECTRICAL Fuse Panel Door 5 88 Y53 6060 1C1 03 17 5...
Страница 299: ...ELECTRICAL Fuse Panel Label 03 17 Y53 6060 1C1 5 89 5...
Страница 370: ......
Страница 391: ......
Страница 392: ......