![Peterbilt 325 2017 Скачать руководство пользователя страница 226](http://html1.mh-extra.com/html/peterbilt/325-2017/325-2017_operators-manual_1532227226.webp)
PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
Recommended PM
Interval
SYSTEM
COMPONENT
MAINTENANCE TASK
I
A
B
C
Front Spring
Inspect for cracked leaves, worn bushings, & excessive corrosion.
X
Spring Pins & Shackles
Inspect for worn parts and excessive joint clearance. Shim or
replace as required.
X
Shock Absorbers
Inspect for leaking, body damage, and damaged or worn bushings.
Replace as required. Check the shock mounting stud torque.
X
Lubricate with approved grease.
X
Spring Pins
Check for proper function.
X
U-bolts (ON HIGHWAY)
Check the general condition and the tightness of the nuts. Tighten
the nuts to the specified torque value as required (shown on page
5-117).
X
Front
Suspension
U-bolts (OFF HIGHWAY)
Check the general condition and the tightness of the nuts. Tighten
the U-bolts after the first day or two of operation. Then tighten the
nuts to the specified torque value as required (shown on page
5-117).
X
5-16
Y53-6060-1C1
(03/17)
5
Содержание 325 2017
Страница 1: ......
Страница 2: ......
Страница 3: ...348 337 330 325...
Страница 4: ......
Страница 5: ...Contents Safety Emergency Controls Driving Maintenance Information Index 1 2 3 4 5 6 7...
Страница 44: ......
Страница 66: ......
Страница 140: ......
Страница 144: ......
Страница 217: ...MAINTENANCE Clutch Adjustment Normal Wear 5 157 Automatic Transmissions 5 158 03 17 Y53 6060 1C1 5 7 5...
Страница 218: ......
Страница 298: ...ELECTRICAL Fuse Panel Door 5 88 Y53 6060 1C1 03 17 5...
Страница 299: ...ELECTRICAL Fuse Panel Label 03 17 Y53 6060 1C1 5 89 5...
Страница 370: ......
Страница 391: ......
Страница 392: ......