3.4 Confirming while the Power is ON
3.4.1 Items to check after turning on the power
■
System configuration example
Check each item in the following four major steps.
■
Items to check before turning ON the power
No.
Item
Description
(1)
Checking the installation of
the external safety circuit
Check to make sure the safety circuit (wiring and installation of over
limit switch) based on an external circuit has been installed securely.
(2)
Checking the safety circuit
by the PLC unit
Check the connection between the unit and over limit switches. Check
the installation condition of the over limit switches.
(3)
Checking the near home
input and home input
Check if the near home input and home input are loaded as the inputs
of the PLC and activated properly by performing JOG operation or
home return operation.
(4)
Checking the rotation,
moving direction, and
moving distance.
Check the rotation, moving direction and moving distance by
performing JOG operation or positioning operation.
3.4 Confirming while the Power is ON
WUME-FPXHPOSG-01
3-5
Содержание FP-XH Series
Страница 2: ... MEMO 2 WUME FPXHPOSG 01 ...
Страница 18: ... MEMO 1 10 WUME FPXHPOSG 01 ...
Страница 30: ... MEMO 3 8 WUME FPXHPOSG 01 ...
Страница 51: ...4 4 Reading Elapsed Values WUME FPXHPOSG 01 4 21 ...
Страница 52: ... MEMO 4 22 WUME FPXHPOSG 01 ...
Страница 88: ... MEMO 5 36 WUME FPXHPOSG 01 ...
Страница 94: ... MEMO 6 6 WUME FPXHPOSG 01 ...
Страница 140: ... MEMO 9 8 WUME FPXHPOSG 01 ...
Страница 193: ... MEMO WUME FPXHPOSG 01 ...
Страница 194: ...Panasonic Industrial Devices SUNX Co Ltd 2020 October 2020 WUME FPXHPOSG 01 ...