50
SECTION 3
Ope
rat
ing Proce
dure
RFID System
User's Manual
SECTION 3
CJ-series ID Sensor Units
ID Sensor Unit Settings
1.
Test Switch (Set on Unit's front panel.)
2.
Mounting and Installation
3.
Unit Number Setting
4.
PLC Power Supply ON
TEST
ON
Test switch
0
1 2 3
4
5
6
7
8
9
0
1 2 3
4
5
6
7
8
9
Set the unit number to 1, and the
following words will be allocated
to the Unit as a Special I/O Unit.
• CIO Area: CIO 2010 to CIO 2019
• DM Area: D20100 to D20199
Power Supply ON
Содержание CJ1W-V680C11
Страница 62: ...60 SECTION 3 Connections and Wiring RFID System User s Manual SECTION 3 CJ series ID Sensor Units MEMO...
Страница 78: ...76 SECTION 4 I O Data Allocations RFID System User s Manual SECTION 4 Data Exchange with the CPU Unit MEMO...
Страница 118: ...116 SECTION 5 RF Tag Memory Error Correction RFID System User s Manual SECTION 5 ID Sensor Unit Functions MEMO...
Страница 158: ...156 SECTION 7 Troubleshooting RFID System User s Manual SECTION 7 Troubleshooting Alarms and Errors MEMO...
Страница 213: ......