SECTION 3
Ope
rat
ing Proce
dure
SECTION 3
CJ-series ID Sensor Units
51
RFID System
User's Manual
Creating I/O Tables
Always create the I/O tables after turning ON the PLC power supply. The I/O tables can be created
from the Programming Console or CX-Programmer.
Initial Settings
1.
Make the settings in the words allocated to Special I/O Units in the DM Area.
For information on setting the Special I/O Unit words in the DM Area, refer to
93.
Peripheral port
Programming Console
Peripheral port
Programming Console
Содержание CJ1W-V680C11
Страница 62: ...60 SECTION 3 Connections and Wiring RFID System User s Manual SECTION 3 CJ series ID Sensor Units MEMO...
Страница 78: ...76 SECTION 4 I O Data Allocations RFID System User s Manual SECTION 4 Data Exchange with the CPU Unit MEMO...
Страница 118: ...116 SECTION 5 RF Tag Memory Error Correction RFID System User s Manual SECTION 5 ID Sensor Unit Functions MEMO...
Страница 158: ...156 SECTION 7 Troubleshooting RFID System User s Manual SECTION 7 Troubleshooting Alarms and Errors MEMO...
Страница 213: ......