53
Introduction
For your basic operation
Maintenance
When encountering a problem
Appendix
3
Start printing on the fi rst side of the media.
4
Reference dashed line
for cutting
Reference solid line to align print
position on fi rst and second sides
When printing is completed, open the front
cover and cut the media.
At the end of the fi rst-side printing, two lines are
printed. One line is a reference solid line to match print
positions on the fi rst and second sides. The other line
is a reference dashed line for cutting.
You are recommended to:
- To cut the media, insert the blade of a box
cutter into the gap between the platen and
the paper guide.
- To easily install the second side of media,
mark the position of the reference solid line
at the second side’s right and left edges.
CAUTION
- The drying time of printed media varies depending on printed images. Confi rm that printed media has dried, and
then proceed to the next operation. Generally, dry the printed fi rst side for three hours or more (24 hours for high-
density print), and then start second side printing.
- Pay attention not to drop the printed media to avoid smearing the media.
5
Remove the supply side media roll from the
Printer.
See P. 41.
CAUTION
- As the media roll is heavy, carefully load or remove it
with a recommended dolly.
Recommended dolly
On carrying the media alone:
6
Move the media roll from
take-up side to supply side.
Remove the take-up side media roll from the
Printer, and move it to the supply side.
See P. 41.
Содержание CS6410
Страница 98: ......