
-
79
-
GENERAL MAINTENANCE
DETERMINING REPLACEMENT OR BUILD UP
STEP 6a
Close the processor jaws until the side of the piercing tip (DA) is next to the guide
blade (DF). Measure the clearance and add shims to achieve a clearance (d64) of
.005”
(.127 mm)
, see Fig. D.
Fig. D
Apply thread adhesive to the socket head cap screws for the guide blade. Then torque
to NPK specifications (see
“FASTENER TORQUE CHART”
).
STEP 7a
After completing all welding maintenance, allow the jaw (BD) to cool slowly.
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...