
-
65
-
GENERAL MAINTENANCE
CUTTER BLADE MAINTENANCE – K JAWS
BLADE-TO-BLADE CLEARANCE
M20K, M28K, and M38K
A blade-to-blade clearance of .000” to .010” (.00 to 0.25 mm) should be maintained for
optimum performance.
See Fig. 2 and 3 for cutting blade and shim arrangement. Refer to the NPK Parts
Manual for part numbers.
PIERCING TIP TO TUNNEL GAP
M20K, M28K, and M38K
The piercing tip to tunnel blade gap can be increased by removing the tunnel spacer,
which can be helpful in some piercing operations.
Removal of the spacer on the M20K increases the gap by .20 inch
(5 mm)
.
Removal of the spacer on the M28K increases the gap by .47 inch (
12 mm
).
Removal of the spacer on the M20K increases the gap by .75 inch (
19 mm
).
Fig. 2
(With weld-on piercing tip)
BD
ARM
BG
PRIMARY CUTTING BLADE
BG1
SECONDARY CUTTING BLADE
BH
SHIM PACK
(drive arm only)
BI
DRIVE ARM
DA
PIERCING TIP
(weld-on)
DB
TUNNEL BLADE
DC
SPACER
DE
SPACER PLATE
DF
GUIDE BLADE
(not shown)
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...