
-
66
-
GENERAL MAINTENANCE
PIERCING TIP TO TUNNEL GAP
M20K, M28K, and M38K
Fig. 3
(With bolt-on piercing tip)
BD
ARM
BG
PRIMARY CUTTING BLADE
BG1
SECONDARY CUTTING BLADE
BH
SHIM PACK
(drive arm only)
BI
DRIVE ARM
DB
TUNNEL BLADE
DC
SPACER
DE
SPACER PLATE
DF
GUIDE BLADE
(not shown)
DG
PIERCING TIP
(bolt-on)
K JAW BLADE SET UP PROCEDURE
M20K, M28K, and M38K
ST1.
Install the primary blades in the arm second. Check to ensure that the primary blade faces are
parallel. See
“COMPONENT DESCRIPTION”
and
“BLADE MAINTENANCE and
ADJUSTMENT”
, Steps 1 and 2.
ST2.
Install the secondary blades in the drive arm. Shim to the primary blades. Check to ensure that
the secondary blade faces are parallel. See
“COMPONENT DESCRIPTION”
and
“BLADE
MAINTENANCE and ADJUSTMENT”
, Step 3.
ST3.
Install the guide blade and shim to the side of the piercing tip. See
“COMPONENT
DESCRIPTION”
and
“BLADE MAINTENANCE and ADJUSTMENT”
, Step 4.
ST4.
Install the tunnel blade in the drive arm. See
“COMPONENT DESCRIPTION”
and
“BLADE
MAINTENANCE and ADJUSTMENT”
, Step 5.
ST5.
Install the piercing tip on the arm
(if needed)
first. See
“COMPONENT DESCRIPTION”
and
“PIECING TIP MAINTENANCE AND REPLACEMENT”
.
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...