
-
141
-
TROUBLESHOOTING
CHECKING THE HYDRAULIC FLOW AT RATED PRESSURE
5
out port
6
in port
fm1
load valve
fm2
flow/temperature
display
fm3
flow/temperature switch
fm4
pressure gauge
(Typical loading type flow meter)
1. Installation of the loading type flow meter.
Install the flow meter (t36) between the Material Processor close (m3) and open
lines (m4) as shown. Typically, the jaw close line is on the left and the jaw open is
on the right of the Material Processor
(looking from the operator’s seat)
.
2. Determine the return line pressure
(pressure drop)
.
Open both shut-off valves (k4) and energize the Material Processor close switch.
Measure the pressure on the flow meter gauge (fm2) with the load valve (fm1) in the
full open position.
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...