
-
134
-
TROUBLESHOOTING
MATERIAL PROCESSOR SEQUENCE, RELIEF VALVE AND
CARRIER RELIEF VALVE SETTINGS
MODEL SERIAL NO.
P1
P2
P3
PROCESSOR
PROCESSOR
MINIMUM CARRIER
SEQUENCE
RELIEF VALVE
RELIEF VALVE
VALVE SETTING
SETTING
SETTING
psi
(bar)
psi
(bar)
psi
(bar)
M20
ALL
2,950
(205)
3,625
(250)
3,825
(265)
M28
ALL
2,950
(205)
3,625
(250)
3,825
(265)
M38
ALL
2,950
(205)
3,625
(250)
3,825
(265)
RELIEF VALVE LOCATION
The Material Processor relief valve cartridges, close (c17) and open (c18) are located
in the relief blocks (bs24) that are bolted to the rotary joint assembly (BN).
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...