
-
46
-
MOUNTING INSTALLATION
NPK Mounting Installation Kits include the parts required to adapt the NPK Material
Processor to the arm of your carrier. The kits include all necessary boom pins,
bushings, spacers, etc.
m1
Stick Pin
m2
Link Pin
m3
Main Whip Hose (jaw close)
m4
Main Whip Hose (jaw open)
m7
Top Bracket
m24
Boom Pin Collar
m39
Rotation Whip Hose
m40
Motor Drain Whip hose
m41
Boom Pin Bushing
m42
Stover Nut
m43
Hex head Cap Screw
NOTE:
NPK Mounting Kits using loose fit bushings to adapt the pins to the top bracket
are not compatible for use with quick attaches or pin grabbers.
M-SERIES TOP BRACKET
The M-Series top bracket is ported for right or left side hose access for rotation and
motor case drain line connections.
ITEM
DESCRIPTION
BO
Holding Valve
BQ2
Rotation Motor
CW
Rotation Hose
CX
Motor Drain Line
m18a
Main Connection (
close
)
- #20 JIC male
m18b
Main Connection (
open
)
- #20 JIC male
m20
Rotation Connections
- #8 JIC male
m21
Motor Drain Connection
- #6 JIC male
m22
Optional Rotation Ports
m23
Optional Drain Port
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...