
-
47
-
MOUNTING INSTALLATION
MOUNTING TO THE CARRIER
1. Position the Material Processor horizontal on wood blocks (t20) as shown.
2. Align the stick pin bore (m26). Install stick pin (m1).
3. Align the link pin bore (m25). Install the link pin (m2).
4. Clean away any dirt found on the hose connections, then connect the whip hoses
(m3 and m4).
5. Connect the rotation whip hoses (m39) and hydraulic motor case drain whip hose
(m40).
6. Open the shut-off valves (k4).
The hydraulic lines must be handled carefully to prevent contamination from entering
the Material Processor or the carrier hydraulic system.
REMOVAL FROM THE CARRIER
1. Retract the cylinders to open the jaws fully.
2. Shut off the carrier’s engine and relieve all hydraulic pressure.
3. Close the shut-off valves.
4. Disconnect the hydraulic hoses before laying the Material Processor down. Install
metal plugs in the hydraulic hoses and metal caps on the stick tubes to keep out
contamination.
5. Position the Material Processor horizontal on wood blocks (t20), as shown in
“MOUNTING TO THE CARRIER”
.
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...