
-
77
-
GENERAL MAINTENANCE
DETERMINING REPLACEMENT OR BUILD UP
The piercing tip profile must be maintained for piercing efficiency. Piercing tip build up
and/or replacement should be completed after all cutting blade, guide blade, and tunnel
blade maintenance has been completed (see
“K JAW BLADE MAINTENANCE AND
ADJUSTMENT”, STEPS 1 through 5.
) Perform the following steps to determine
whether the piercing tip can be built up or should be replaced.
STEP 1a
Place a steel straight edge (t15) on the face of the primary blades (BG). The side of
the piercing tip (DA) should be even/parallel with the primary blade face. Record the
amount of clearance/gap (d65) between the straight edge and the side of the tip, see
Fig. A.
Fig. A
STEP 2a
Close the jaws until the piercing tip (DA) just enters the female jaw (BI) tunnel. Note
the wear on the corners of the piercing tip and also the gap (d66) between the lead
edge of the piercing tip and the tunnel blade (DB), see Fig. B.
Fig. B
Содержание M20C
Страница 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Страница 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Страница 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Страница 149: ... 149 WARRANTY STATEMENTS ...
Страница 150: ... 150 WARRANTY STATEMENTS ...
Страница 152: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9600I 10 18 Material Processor Instruction Manual ...