
Novatest S.r.l.
Manual for Multichannel Ultrasonic Pile Integrity Tester
64
3.2.1 Basic parameter setup
Basic parameter setup interface may be used to create new
Project name and Foundation pile name and set parameters such as
Pipe spacing and Number of pipe, etc.
Figure 4.2 Parameter setup
1. Create new project or select existing project
1) Create new project
Press New Site button behind the list box of Site name to pop up
soft keyboard for inputting character, input project name to create a
subfolder with such name, all data files of tested piles will be saved