
3 - INSTALLATION
3-5
10. If already installed, remove the
"Power Sweep Engage-
ment Lever"
11
, and all of the
"Lever Hardware"
12
securing it.
12
12
12
12
11
12
Fig. # 3-9 Remove the "Power Sweep Engagement Lever"
NOTE
If installing in an existing grain bin with a full aeration
floor, it may be necessary to remove about half of the
floor.
NOTE
The aeration floor planks must run perpendicular to
U-Trough Tube.
Fig. # 3-10 Grain Bin With Half of the Aeration Floor Re-
moved / Installed
11. Move the
"U-Trough Tube"
7
inside the grain bin
"Center Hopper Sump"
end first.
12. Insert the discharge end of the
"U-Trough Tube"
7
through the hole you cut in the grain bin.
7
Fig. # 3-11 Insert "U-Trough Tube" Through the Hole
13. Measure and center the
"Splined Gearbox Output
Shaft" 11
with the exact center of the grain bin.
Fig. # 3-12) (See Fig. # 3-13)
11
Fig. # 3-12 Center The Splined Gearbox Output Shaft With
the Center of the Grain Bin
Содержание The Grain Handler 10
Страница 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Страница 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Страница 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Страница 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Страница 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Страница 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Страница 128: ...i 6 www norwoodsales com 1 800 446 0316...
Страница 129: ......