
3 - INSTALLATION
3-4
5. First pattern is traced onto the grain bin wall.
Fig. # 3-5 First Pattern Traced Onto Grain Bin Wall
6. Now measure upward from the horizontal line at 2-5/8"
and place a mark.
7. Place the top of the
"U-Trough Tube Rodent Cover" 1
at the 2-5/8" mark. Level the cover using a
"6" Torpedo
Level"
6
and trace the remaining lines onto the outside
of the
"Grain Bin Wall"
5
5
6
1
Fig. # 3-6 Trace 2nd Pattern Onto Grain Bin Wall
8. Second pattern is traced onto the grain bin wall.
Fig. # 3-7 Second Pattern Traced Onto Grain Bin Wall
9. Cut the hole you traced for the
"U-Trough Tube" 7
,
"Flange" 8
,
"U-Trough Control Pinion Cover" 9
,
&
"Control Pinions" 10
to pass through the grain bin
wall with minimal clearance.
Fig. # 3-8 Cut the hole you traced for the "U-Trough Tube"
Содержание The Grain Handler 10
Страница 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Страница 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Страница 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Страница 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Страница 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Страница 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Страница 128: ...i 6 www norwoodsales com 1 800 446 0316...
Страница 129: ......