Installation
A 3-1
Part 331235C
E
2003 Nordson Corporation
Part A: System Overview
Section A 3
Installation
WARNING:
Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
Introduction
This section explains general installation procedures for the Sure Coat
modular gun control system. Installation procedures for optional
components are explained in their individual parts of this manual.
NOTE:
If you order any of the optional upgrade kits for the modular gun
control system, installation and operation instructions will be shipped with
the kit.
NOTE:
Refer to the powder application equipment manuals for additional
installation instructions.
Mounting
NOTE:
The modular gun control system is mounted on top of a varying
number of metal bases. The number of the bases is dependant upon the
number of pneumatic modules used in the system. The bases raise the
modular gun control system so that the central control unit will be at eye
level.
1. The modular gun control system is shipped bolted upright to a wooden
pallet. Unbolt the modular gun control system from the pallet.
2. Find a clean, flat floor surface to install the modular gun control system.
The area should be near the powder spray booth main electrical panel
and air supply.
3. Bolt the modular gun control system to the floor or booth operator
platform using suitable, customer-supplied hardware.
Содержание Sure Coat
Страница 6: ...Table of Contents ii Part 331235C E 2003 Nordson Corporation Part A System Overview...
Страница 14: ...Safety A 1 4 Part 331235C E 2003 Nordson Corporation Part A System Overview...
Страница 34: ...Installation A 3 6 Part 331235C E 2003 Nordson Corporation Part A System Overview...
Страница 52: ...Operation A 5 12 Part 331235C E 2003 Nordson Corporation Part A System Overview...
Страница 64: ...Troubleshooting A 6 12 Part 331235C E 2003 Nordson Corporation Part A System Overview...