Inspection
Upon receipt of equipment, carefully check the shipment
against the bill of lading and inspect each chiller for any
damage incurred during shipment . Thoroughly check for
any visible damage of control panels and electrical and/
or refrigeration components or broken copper lines . The
carrier must make proper notation of any damages or
shortages on all copies of the bill of lading and complete a
common carrier inspection report prior to final acceptance
of the shipment .
Note:
It is the responsibility of the
purchaser to file all necessary claims with the carrier. In
addition, please notify the ClimaCool Customer Service
Department at 405-815-3000 or customerservice@
climacoolcorp .com of all damage immediately .
Storage
Chillers should be stored in an upright position and kept in a
clean, dry area .
Handling of Modules
Carefully remove the module’s packaging . The chiller’s
steel base cut-outs provide maneuverability by fork lift or
pallet jack into its final position (see Rigging and Lifting
Procedures Figures 3 - 5 on page 10) . Verify that all header
grooved couplings and mounting hardware kits are on site
prior to connecting the modules .
Note:
Consult factory for
handling other than in the upright position .
Rigging and Lifting
Each module should be lifted by using a pallet jack or fork
lift . If it is necessary to utilize a crane for rigging or lifting,
each module shall be lifted by using lifting straps and
spreader bars using rigging points identified on page 10 -
Rigging and Lifting Procedures .
Warranty
To ensure proper equipment longevity, design performance
and reliability, all ClimaCool modular chillers must be
installed, operated and maintained in accordance with
ClimaCool IO&M manuals . Water quality is of the utmost
importance for the proper care and maintenance of the
modular chiller system and regular treatment of the water
will increase longevity of the system .
Failure to provide
adequate filtration or treatment of evaporator water
will void the ClimaCool module’s warranty.
A factory
authorized technician is required to perform the start-
up of the ClimaCool chiller . Please contact the ClimaCool
Customer Service Department at 405 .815 .3000 or email
Technical Support at technicalsupport@climacoolcorp .com
to schedule .
There is a minimum of three (3) weeks notice
required to schedule the factory start-up.
Pre-Installation
Содержание CLIMACOOL UCR 30
Страница 19: ...17 www climacoolcorp com Voltage Phase Monitor Wiring Diagram...
Страница 29: ...27 www climacoolcorp com Evaporator Water Pressure Drop Charts...
Страница 30: ...28 www climacoolcorp com Glycol Performance Adjustments Factor Charts...
Страница 41: ...39 www climacoolcorp com Condenser Layout for RC1 007A H24 and RC1 008A H24 1 Row 2 Fan 1140RPM...
Страница 42: ...40 www climacoolcorp com Condenser Layout for RC2 019A 026A and 31A H48 and RC2 038A H44 2 Row 4 Fan 1140RPM...
Страница 43: ...41 www climacoolcorp com Condenser Layout for RC2 018A X48 RC2 026A X40 and RC2 032A X44 2 Row 4 Fan 830 RPM...
Страница 47: ...45 www climacoolcorp com 45 www climacoolcorp com Condenser Layout for RC2 048A Q82 2 Row 8 Fan 540RPM...
Страница 78: ...76 www climacoolcorp com Wiring Diagram...
Страница 79: ...77 www climacoolcorp com Wiring Diagram...
Страница 80: ...78 www climacoolcorp com Wiring Diagram CoolLogic Control Panel...
Страница 81: ...79 www climacoolcorp com Wiring Diagram CoolLogic Control Panel...