Pre Start-Up Checklist* (Air-Cooled) UCR
• Fax: 405.815.3000
Project Name:
Date:
Address/Phone:
1.
Are modules connected properly “per Codes and ClimaCool Installati on Manual and
completed Remote Condenser Warranty Agreement/Acknowledgement”?
(Installati on, Operati on & Maintenance (IOM) Manual is available at
www.climacoolcorp.com
).
2. Is there a 60-80 mesh strainer on the evaporator inlet water?
(Fill water to chiller being sure to pass through a minimum of 60 mesh strainer.)
3.
Is chilled water system fi lled, fl ushed and all air purged from system?
(All air
must be
purged from system prior to startup. See Filling the Water System in IOM.)
4.
Are all pumps tested and operati onal?
5.
Are required GPM’s (verifi ed by pressure diff erenti al) supplied to the chiller?
(See project specifi cati ons or selecti on and performance sheets available from ClimaCool Sales Rep.)
6.
Are the pressure diff erenti al fl ow sensors properly installled and wired to the CoolLogic controller?
7.
Have all chiller coupling connecti ons been leak tested?
8.
Is water presently circulati ng through chiller?
9.
Verifi ed that temperature sensors and voltage/phase monitor have been installed?
10.
Verifi ed power supply agrees with chiller nameplate?
11.
Is power and communicati on wiring complete to each module?
12.
Verifi ed that wiring and devices meet with approved electrical submitt al drawings?
13.
Is required load available to run multi ple compressors at start-up?
14.
Is condenser functi onal to maintain condenser required operati on?
(This includes maintaining “minimum” inlet temperature. See “Operati onal Limitati ons” in IOM.)
Note: Air Cooled Condenser installa� on, charging and checkout by others.
YES
NO
If you checked “No” to any questi on above, provide the line reference number and the date of scheduled completi on below. Please
note
all condi� ons must be complete prior to the start-up date
.
* This form must be completed and submitt ed to ClimaCool Corp.
three (3) weeks
prior to fi nal scheduling of any Start-up.
Note:
If any of the above items are not complete at ti me of start-up, backcharges will be assessed for additi onal costs.
Contractor Name:
Address:
(Authorized Signature)
Phone: Date:
Содержание CLIMACOOL UCR 30
Страница 19: ...17 www climacoolcorp com Voltage Phase Monitor Wiring Diagram...
Страница 29: ...27 www climacoolcorp com Evaporator Water Pressure Drop Charts...
Страница 30: ...28 www climacoolcorp com Glycol Performance Adjustments Factor Charts...
Страница 41: ...39 www climacoolcorp com Condenser Layout for RC1 007A H24 and RC1 008A H24 1 Row 2 Fan 1140RPM...
Страница 42: ...40 www climacoolcorp com Condenser Layout for RC2 019A 026A and 31A H48 and RC2 038A H44 2 Row 4 Fan 1140RPM...
Страница 43: ...41 www climacoolcorp com Condenser Layout for RC2 018A X48 RC2 026A X40 and RC2 032A X44 2 Row 4 Fan 830 RPM...
Страница 47: ...45 www climacoolcorp com 45 www climacoolcorp com Condenser Layout for RC2 048A Q82 2 Row 8 Fan 540RPM...
Страница 78: ...76 www climacoolcorp com Wiring Diagram...
Страница 79: ...77 www climacoolcorp com Wiring Diagram...
Страница 80: ...78 www climacoolcorp com Wiring Diagram CoolLogic Control Panel...
Страница 81: ...79 www climacoolcorp com Wiring Diagram CoolLogic Control Panel...