3. Basic Operation
PROGRAMMABLE AC POWER SOURCE
66
2.
In the [Target Phs] item, select the phase of which the measured value is to be displayed. For
the line voltage, select L1-L2, L2-L3, or L3-L1.
3.
Close the window. For how to close the window, see
Operation procedures by using shortcuts
1.
+
Switches the target phase of which the measured value is displayed
Press the SHIFT key to enter the shift state (the SHIFT LED illuminates). When you press the 2
key in the numeric keypad in the shift state, the phase is switched in the order of
L1
→
L2
→
L1-L2
→
L1 ... in the single-phase three-wire. In the three-phase, it is switched in the
order of L1
→
L2
→
L3
→
L1-L2
→
L2-L3
→
L3-L1
→
L1 ...
Содержание DP015S
Страница 1: ...PROGRAMMABLE AC POWER SOURCE DP Series INSTRUCTION MANUAL NF Corporation ...
Страница 2: ......
Страница 3: ...PROGRAMMABLE AC POWER SOURCE DP Series INSTRUCTION MANUAL DA00027113 001 ...
Страница 4: ......
Страница 18: ......
Страница 19: ...DP Series 1 1 Outline 1 1 Overview 2 1 2 Series Line up and Polyphase System Configuration 2 1 3 Features 4 ...
Страница 24: ...1 Outline PROGRAMMABLE AC POWER SOURCE 6 ...
Страница 215: ...DP Series 197 5 Description of Screen and Menu 5 1 Screen Configuration 198 5 2 Menu Composition 202 ...
Страница 224: ...5 Description of Screen and Menu PROGRAMMABLE AC POWER SOURCE 206 ...
Страница 225: ...DP Series 207 6 Remote Control 6 1 Communication Interface 208 6 2 Remote Local State Switching 214 ...
Страница 237: ...7 8 Replacement Air Filter DP Series 219 フロントグリル フロントグリル Front grill 1 Front grill 2 Figure 7 2 Front Grills ...
Страница 238: ...7 Options PROGRAMMABLE AC POWER SOURCE 220 ...
Страница 239: ...DP Series 221 8 Troubleshooting 8 1 Error Messages and Error Handling 222 8 2 When a Failure is Suspected 229 ...
Страница 298: ......
Страница 300: ......
Страница 302: ......
Страница 303: ......
Страница 304: ...http www nfcorp co jp NF Corporation 6 3 20 Tsunashima Higashi Kohoku ku Yokohama 223 8508 JAPAN ...