Issue 2.0
SV9100 System Hardware Manual
4-21
8.
Load the SRAM data saved in step 1, above.
From the PCPro “System Data Save/Load/Verify” menu load
the data from the specified file.
- OAI FLF Memory
Battery replacement is complete.
3.1.2.2
GPZ-IPLE Daughter Board Installation
1.
Figure 4-10 Installing the GPZ-IPLE Daughter
to install the GPZ-IPLE daughter board,
if required.
2.
Ensure the power supply is
OFF
, then slide the GCD-CP10
into Slot 1 in the Controlling Chassis.
3.1.2.3
SD-A1/SD-B1 Installation
1.
Figure 4-6 GCD-CP10 Blade Layout on page 4-15
to install the SD-A1 or SD-B1 SD card, if required.
2.
Ensure the power supply is
OFF
, then slide the SD card
(label side up) into the slot until it clicks.
To remove: Carefully push on the SD card until it clicks and
release. Card can be removed from the slot.
3.1.2.4
Background Music (BGM) or Music on Hold (MOH)
1.
If external Background Music (BGM) or Music on Hold
(MOH) is being installed, plug the cable into the AUX1 or
AUX2 pin jack connector on the GCD-CP10. The other end
of the cable plugs into the music source.
Refer to the PGDAD in Chapter 9, section
for details on connecting to a
music source.
When the system software is upgraded, the flash
memory is updated with the new software version.
Either the Hot or Cold start-up method can be used or
the system can be upgraded using system software.
Refer to
2.6.1 Performing a Cold Start on page 4-9
,
2.6.2 Performing a Hot Start on page 4-10
Performing a Software Upgrade on page 4-13
.
Customer information is stored in the RAM memory
which is restored after a power failure is cleared. The
lithium battery in the system saves the RAM memory
when power is lost.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...