Installing the SV9100 Chassis
Follow safety precautions indicated in section
2.1 Precautionary Information: on
Determine the type of mounting (wall, floor, stand or rack) to be used.
3.3 Installing the 19” (CHS2UG) Chassis
The CHS2UG chassis has six universal blade slots for legacy line/trunk blade
(Single Line Telephone Interface, Digital multiline terminal Interface, Central
Office Trunk, ISDN PRI Interface, etc.). In-skin Application Blades (In-skin UMS,
In-Skin Router, etc.). It also houses the BUS Interface Blade, Power Supply Unit
(PSU) and Cooling Fan.
When the GCD-CP10 blade is installed in the first 19” chassis, it is called the
controlling chassis. Additional chassis, called expansion chassis, can be installed
to increase the capacity of the system to meet the customer’s business needs.
Each chassis (Expansion or Controlling), is powered by an MPS7101 power
supply.
Before proceeding with installation of chassis, ensure site preparation is
completed. The CHS2UG chassis can be:
4.1 Wall Mounting the 19” (CHS2UG) Chassis on
Floor-mounted – refer to
5.1 Floor Mounting the 19” (CHS2UG) Chassis on
Stand-mounted – refer to
6.1 Stand Mounting the 19” (CHS2UG) Chassis on
Rack-mounted – refer to
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...