x
Table of Contents
Issue 2.0
GCD-ETIA (Gigabit PoE Switch)................................................... 4-95
Stacking Architecture..............................................................4-96
GCD-CP10 IP Address Assignment .......................................4-97
Group Formation.....................................................................4-97
Port Number Determination ....................................................4-97
Unmanaged Switch Functions ................................................4-98
Cabling and MDF Connection............................................................... 4-99
Connection Requirements............................................................. 4-99
Cabling Precautions ...................................................................... 4-99
Wiring Between the Chassis and the MDF ................................... 4-99
Chapter 5 Installing DT Series Digital and IP Multiline Terminals
DT300/DT400 Series Digital Multiline Terminals ................................. 5-14
DT300 Series Digital Multiline Terminals ...................................... 5-14
2.1.1 DTL-2E-1 (BK) TEL ..................................................................... 5-14
2.1.2 DTL-6DE-1 (BK) TEL................................................................... 5-15
2.1.3 DTL-12E-1 (BK) TEL ................................................................... 5-16
2.1.4 DTL-8LD (BK)/(WH) TEL ............................................................. 5-17
2.1.5 DTL-12BT-1 (BK) TEL ................................................................. 5-18
2.1.6 DTL-12D-1 (BK)/(WH) TEL.......................................................... 5-19
2.1.7 DTL-12PA-1 (BK) TEL ................................................................. 5-20
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...