Issue 2.0
SV9100 System Hardware Manual
4-23
3.1.4
LED Indications
The LEDs on the GCD-CP10 indicate the following:
RUN (D23) = The CPU is operating (green)
D20, and D21 = Alarms (red)
D22 = SD Memory Card access/Alarm indication (red)
D25 = The USB memory connection status (red)
(LED off when no USB memory installed)
D24 = Not Used
Refer to Program 90-10: System Alarm Setup for details on assigning
alarm LEDs.
Table 4-8 GCD-CP10 LED Indications
provides a list of each LED and
associated operation and status indications. Refer to
for the location of the LEDs on the GCD-CP10.
Table 4-8 GCD-CP10 LED Indications
LED Indication
Status
RUN (D23)
D20
D21
D22
D25
Blinking
Off
Off
Off
On Steady When
USB Memory is
Installing
System operating normally
Off
Off
Off
Off
Blinking
Boot is starting
Off
On
Off
Off
Off
Initializing the disk or
formatting
Blinking
Blinking
Off
Access
Blink
On Steady When
USB Memory is
Installing
Boot program is initializing in
the flash memory
Off
On
On
Access
Blink
On Steady When
USB Memory is
Installing
Reading system software
Off
On
Off
Access
Blink
On Steady When
USB Memory is
Installing
Upgrading system software
On
Blinking Blinking Blinking On Steady When
USB Memory is
Installing
Finish formatting (SRAM,
Flash)
Blinking
Off
Off
Off
Off
DRAM error
Blinking
Off
Off
On
On Steady When
USB Memory is
Installing
FPGA version error
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...