Issue 2.0
SV9100 System Hardware Manual
3-9
3.3.2
Installing Expansion Blades in the 19” Chassis (Optional)
When adding additional chassis to the system to expand the capacity, a
GPZ-BS10 must be installed in the Controlling Chassis and a GPZ-BS11
must be installed in all Expansion Chassis. This connection is required with
any multiple-chassis setup.
The GPZ-BS10 connects the Controlling Chassis to the Expansion Chassis
by connecting to a GPZ-BS11, which is installed on each Expansion
Chassis. These Expansion Interface Units allow the CPU to transmit/
receive data as required to the additional chassis.
The GPZ-BS10 is installed in the Expansion bay Controlling Chassis which
is equipped with a CPU blade. The GPZ-BS11 is installed in the Expansion
bay of the Expansion Chassis, which does not have a CPU.
The Expansion cable connects the Controlling Chassis and its GPZ-BS10
interface to the second, third, and fourth GPZ-BS11 interface.
Use only the CAT 5 cables provided by NEC to make the connections
between the Controlling and Expansion Chassis.
The GPZ-BS10 provides:
Communication Processor Interface for data handling through
Communication Channel
(24
slots maximum)
64 Channels for Telephony Resource (e.g., DTMF Tone Receiver,
Call Progress Tone Detector, MFC Tone Receiver, Caller ID Receiver,
Caller ID Signal Sender)
DSP Resource Management
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...