Issue 2.0
SV9100 System Hardware Manual
4-59
The BRI blade provides:
Two (GCD-2BRIA) 2-Channel Circuits (2B + D) configured as T-Bus
64Kb/s Clear B-Channel and 16Kb/s D-Channel
Two Status LEDs
Connector for GPZ-2BRIA
These trunk circuits can be connected to either ISDN trunks or ISDN
telephones, depending on the switch setting in system programming. All
ISDN telephone circuits (#1-2 and #3-4 with the BRI daughter board) are
supplied DC power from the system.
The BRI Interface blade uses a single universal slot. Each blade connects
to the network via an NTI Network Termination.
To block new calls on the blade, system programming must be used. This
program prevents new calls from being established on the blade, but it does
not terminate any existing call.
With the maximum number of blades installed, the following can be
provided:
The 2BRI provides 30 BRI circuits and 60 BRI channels.
(Port Consumption: T-Bus=4 ports)
Refer to the following tables for maximum upgrade capacities of the
GCD-2BRIA blade:
Table 2-6 SV9100 Maximum 9.5” Gateway and 19” System
Capacities – Blades on page 2-12
Table 2-7 SV9100 Maximum 9.5” Base and Expansion System
Capacities – Blades on page 2-14
5.3.2
Installation
To install the GCD-2BRIA
:
1.
Plug the GCD-2BRIA blade into the system chassis.
2.
Before proceeding to Step 3, wait to verify that the STATUS LED
starts to flash. (Refer to
Figure 4-21 GCD-2BRIA Blade on page 4-58
for the location of the LEDs on the blade.)
NOTE
❍
With normal operation, the status LED flashes fast.
If trouble was found during the self diagnostics
routine, the status LED flashes slow.
❍
Once connected, the PKG LED will not be indicated
for the status of Layer 1 Link.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...