5.1 Floor Mounting the 19” (CHS2UG) Chassis
The CHS2UG controlling and expansion chassis can be mounted on the floor
using the CHS BASE UNIT and the CHS2UG JOINT BRACKET KIT.
5.1.1
CHS2UG Chassis Installation
1.
Use the template shown in
Figure 3-83 Floor Mount Spacing Guide
for required spacing before drilling holes for 0.39” (10mm) anchor
bolts (locally procured).
2.
Mark and drill the four holes required to install the CHS BASE UNIT.
3.
Using anchor bolts, secure the CHS BASE UNIT to the floor. Refer to
Figure 3-84 Secure CHS BASE UNIT with Anchor Bolts
for screw
Figure 3-83 Floor Mount Spacing Guide
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...