System Hardware Manual
iii
Issue 2.0
Constructing the Main Distribution Frame (MDF)............................ 3-3
Power Failure Transfer.................................................................... 3-4
Fax CO Branch Connection ............................................................ 3-5
Unpacking the Equipment ............................................................... 3-5
Before Installation............................................................................ 3-5
Installing the 19” (CHS2UG) Chassis.............................................. 3-6
3.3.1 Installing the 19” Controlling Chassis.............................................3-8
3.3.2 Installing Expansion Blades in the 19” Chassis (Optional) ............3-9
Connector Pin-Out on the GPZ-BS10/GPZ-BS11 ..................3-10
Install the GPZ-BS10 Expansion Base Blade in the CHS2UG Con-
trolling Chassis .......................................................................3-10
Install the GPZ-BS11 Expansion Blade in the CHS2UG Expansion
Chassis ...................................................................................3-13
Connect the Controlling and Expansion Chassis....................3-17
3.3.3 Install Grounding on 19” Chassis.................................................3-19
3.3.4 Install Grounding on Multiple 19” Chassis (Optional)...................3-19
3.3.5 Install AC Power Cords on 19” Chassis.......................................3-20
3.3.6 Install AC Power Cords on Multiple 19” Chassis (Optional).........3-21
3.3.7 Install Additional Blades 19” Chassis...........................................3-21
3.3.8 Apply Power to the 19” Chassis...................................................3-21
Installing the 9.5” Gateway (CHS2UG GW) and Base (CHS2UG B)
3.4.1 Install Grounding on 9.5” Gateway or Base Chassis ...................3-23
3.4.2 Install AC Power Cord 9.5” Gateway or Base Chassis ................3-23
3.4.3 Install Additional Blades 9.5” Gateway or Base Chassis .............3-23
3.4.4 Apply Power to the 9.5” Gateway or Base Chassis .....................3-23
Installing the 9.5” Base (CHS2UG B) and Expansion (CHS2UG E)
3.5.1 Connecting the 9.5” Base and Expansion Chassis......................3-25
3.5.2 Installing Expansion Blades in the 9.5” Base and Expansion Chassis
(Optional) .....................................................................................3-29
Connector Pin-Out on the GPZ-BS10/GPZ-BS11 ..................3-30
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...