Issue 2.0
4-100
Installing the SV9100 Blades
Table 4-39 MDF Cable Colors
Pin
Outs
Cable Colors
1
2
3
4
5
6
1
BR–WH
GN–RD
BR–BK
BL–YL
SL–YL
BR–VI
2
GN–WH
OR–RD
BL–BK
SL–BK
BR–YL
GN–VI
3
OR–WH
BL–RD
SL–RD
BR–GN
GN–YL
OR–VI
4
WH–BL
WH–SL
RD–BR
BK–GN
YL–OR
VI–BL
5
BL–WH
SL–WH
BR–RD
GN–BK
OR–YL
BL–VI
6
WH–OR
RD–BL
RD–SL
GN–BR
YL–GN
VI–OR
7
WH–GN
RD–OR
BK–BL
BK–SL
YL–BR
VI–GN
8
WH–BR
RD–GN
BK–OR
YL–BL
YL–SL
VI–BR
Table 4-40 MDF Cable Connections (Station)
Connector
MDF
Pin No.
Running
Cable
Station
Cable
DTL
DLCA
LCA
LTA
8
16
4
8
DLCA
LCA
BRI
COT
1
26
1
WH–BL
BL–WH
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
TA–1
TB–1
T
R
27
2
WH–OR
OR–WH
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
RA–1
RB–1
T
R
28
3
WH–GN
GN–WH
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
TA–2
TB–2
T
R
29
4
WH–BR
BR–WH
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
RA–2
RB–2
T
R
2
30
5
WH–SL
SL–WH
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
TA–1
TB–1
T
R
31
6
RD–BL
BL–RD
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
RA–1
RB–1
T
R
32
7
RD–OR
OR–RD
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
TA–2
TB–2
T
R
33
8
RD–GN
GN–RD
GN
RD
T
R
T
R
T
R
T
R
T
R
T
R
RA–2
RB–2
T
R
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...