Issue 2.0
SV9100 System Hardware Manual
3-37
3.5.4
Install Grounding on Multiple 9.5” Base and Expansion Chassis
From the factory, the SG, ETH and PBXG grounds are located inside the
chassis and are connected to the FG ground (frame ground) on the back of
the chassis.
Each chassis (CHS2UG B) in the system must be grounded separately
using the procedure listed below.
The CHS2UG E (9.5” expansion chassis) does not have an FG lug.
1.
Ensure all Controlling and Expansion Chassis are powered down and
unplugged.
2.
Ground
each
chassis [refer to
Figure 3-45 9.5” Chassis (Rear View)
] by connecting a 14 AWG wire from the FG lug on the
back side of the chassis to an electrical service ground (Connect to
grounding conductor (Less than 10 ohms))
.
3.5.5
Install AC Power Cord on 9.5” Base and Expansion Chassis
Locate the supplied AC power cord and attach to the AC Inlet located on the
back of the chassis [refer to
Figure 3-45 9.5” Chassis (Rear View) on page
The CHS2UG E (9.5” expansion chassis) does not have an AC Inlet.
3.5.6
Install AC Power Cord on Multiple 9.5” Base and Expansion
Chassis
Locate the supplied AC power cords and attach to the AC Inlets located on
the back of the Controlling and Expansion Chassis.
The CHS2UG E (9.5” expansion chassis) does not have an AC Inlet.
3.5.7
Install Additional Blades in the 9.5” Base and Expansion
Chassis
Refer to Chapter 4,
2.1 Installation and Safety Precautions on page 4-4
.
3.5.8
Applying Power to the 9.5” Base and Expansion Chassis
Refer to Chapter 4,
2.6 Powering Up the SV9100 System on page 4-9
.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...