This chapter contains information to help the technician install the chassis for the
SV9100 system. The technician should be familiar with this section
before
installing
any equipment.
S
ECTION
2
S
ITE
P
REPARATION
AND
MDF/IDF C
ONSTRUCTION
Pre-installation planning is essential. Advanced planning minimizes installation time,
cost, and disruption of the customer business activities.
2.1 Precautionary Information
:
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically
designed for wet locations.
Never touch uninsulated telephone wires or terminals unless the telephone line
is disconnected at the network interface.
Use caution when installing or modifying telephone lines.
To avoid shock or equipment damage, do not plug in or turn the system power
on before completing the installation process.
Avoid working with the equipment during electrical storms.
Use only commercial AC power to prevent shock or fire.
Use the power cord supplied for the chassis.
To prevent overheating, do not bundle AC power cords together.
Make sure the chassis has a proper earth ground.
Install batteries with the correct polarity to prevent damaging equipment.
To avoid damage, the chassis should not be placed on unstable surfaces.
WARNING
Observe the following warnings during installation.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...