Issue 2.0
3-46
Installing the SV9100 Chassis
4.2 Wall Mounting the 9.5” Gateway (CHS2UG GW) and Base
(CHS2UG B) Chassis
When wall mounting the chassis, ensure the wall can support the weight of the
chassis and (25 lbs per system chassis ---- including blades, cords, power supply,
etc.). The chassis is secured to the wall with a wall mount bracket.
Optional wall mounting procedures exist for the 9.5” chassis.
Option 1
: the
mounting bracket is secured to the wall and the chassis is attached to the bracket.
Option 2
attaches the bracket to the 9.5” chassis and then, using the key-holes as
a guide, the assembled unit slides over screws secured to the wall using the
template shown in
To wall mount the Base and Expansion chassis as a combined unit, refer to
4.2.1.1 Wall Mounting the 9.5” Base (CHS2UG B) and Expansion (CHS2UG E)
Chassis on page 3-54
To wall mount the CHS2UG B with the external battery installed, refer to
4.2.2.2 Wall Mounting the CHS2UG B with the CHS2UG B Small Batt Box
on page 3-63
4.2.1
Option 1 – Wall Mounting the 9.5 inch Base
(
CHS2UG B
)
Chassis
When mounted, clearance between the wall and the CHS2UG B/
CHS2UG E chassis is approximately 1.7 in (43mm) due to height of
the wall mounting bracket.
The chassis must be mounted horizontally with the slot (front) side on
the right.
Due to EXIFU cable length, a maximum of 2 (1 CHS2UG B and 1 CHS2UG E)
chassis can be wall mounted. If additional chassis are to be mounted, consider
using the floor mounting procedure.
Figure 3-53 Wall Mount Positioning for 9.5” Base/Expansion Chassis
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...