Issue 2.0
SV9100 System Hardware Manual
3-3
2.3.2
Selecting a Permanent MDF Location
When selecting a permanent site for the MDF, the technician may
encounter some of the following conditions:
Limited space is available but must be used.
The available space may pose one or more environmental hazards.
The proposed location has limitations such as insufficient lighting or
the lack of a suitable ground for the chassis.
The technician that encounters these conditions must provide the
best possible solution for installing the equipment. This document
cannot cover all possible situations, precautions, and actions.
2.3.3
Selecting a Site for Installing the Telephones
When a site is being selected for telephone installation, consider the
following conditions to ensure proper installation:
Ensure cable length and line resistance (loop), between the chassis
and telephones, comply with the specifications listed.
Select a place where devices that require an external power supply
can be connected easily to an AC outlet.
2.4 Constructing the Main Distribution Frame (MDF)
The Main Distribution Frame (MDF) has two different standard quick-connect
terminal blocks that are mounted on a 3/4-inch plywood backboard. Mounting
these blocks on standoffs for ease of access is recommended. The recommended
blocks are 66B50 for termination of the MDF Cable Assembly and 66M50 for
termination of the station cables.
The Intermediate Distribution Frame (IDF) requires the 66M50 blocks only.
Both the MDF and the IDF use standard bridging clips for each terminal block.
The bridging clips mate the left half of the terminal block (terminated cable run) to
the right half of the terminal block (cross connection wire) to the terminal block
(cross connection wire). The bridging clips are also useful during troubleshooting
to help isolate the cable runs and terminals/telephones from the central
equipment and the Central Office Network from the system.
The CHS2UG chassis can be mounted on the wall, the floor, a stand or in a rack.
The CHS2UG GW chassis can be mounted on the wall, a stand or in a rack.
Plywood should first be installed on the wall where the chassis will be positioned,
to allow for secure anchoring. It has a bracket, which can be used to secure each
chassis in any installation. Ensure that enough space is available to allow the
installation of the additional chassis above and below the Controlling Chassis.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...