Issue 2.0
4-20
Installing the SV9100 Blades
2.
Push down on the battery, opposite from the plus (+) symbol
Figure 4-8 GCD-CP10 Battery Installation
Battery Removal
1.
Ensure backup of SRAM data on GCD-CP10.
When removing the backup battery, SRAM data and system
clock are initialized. Use the following to store the SRAM
data (Reconfigure the system clock after replacing the
battery).
2.
Power off the system and remove the GCD-CP10 from the
chassis.
3.
Carefully lift the battery from the socket.
4.
Install the replacement battery (refer to
Installation and Removal on page 4-19
5.
Install the blade into the chassis and power on the system.
6.
Reset the system (press RESET on the front of the
GCD-CP10 blade).
7.
Configure the system clock using the PCPro “Quick Setup”
menu or the command (CM02).
CAUTION
❍
Before removing the GCD-CP10 from the
chassis to install or replace a battery, ensure
the system is powered Off.
❍
When removing the backup battery, SRAM
data and system clock are initialized. Make a
backup of the SRAM in advance and
configure the system clock after battery
replacement.
IMPORTANT
❍
Replace the battery every 6 years.
❍
Contact the reseller where you bought the
product for a replacement battery.
CAUTION
The following SRAM data types are important
for the client. If stored, this procedure must be
used to restore the data.
❍
Billing memory
❍
SMDR Billing data
Table 4-5 SRAM Data Types
SRAM Data
Measure
Fault Information
Read the fault information using the PCPro “Fault
Display” menu.
OAI FLF Memory
Save the memory by specifying “DBM data (PHS/OAI)”
in the PCPro “System Data Save/Load Verify” menu.
Billing Memory
Print the billing memory using an external printer.
SMDR Billing Data
Delete the billing data using SMDR/CR1000.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...