3-12 Installing Server
INSTALLING the Tower Conversion Kit (N8843-003)
This section describes how to install the rack-mount model of NEC Express5800/ft series without
using the dedicated rack.
IMPORTANT:
NEC Express5800/ft series is a precision instrument. You should ask maintenance
personnel to install it.
Select a suitable site for tower model.
CAUTION
Observe the following precautions to use the equipment safely. There are risks of a
burn, injury, or damage to physical assets. For details, see “Notes for Safe
Handling“ in Chapter 1.
Remove all the CPU/IO modules of the server before moving the equipment.
Do not install the equipment in non-designated places.
AC parallel bi-polar
power outlet with
grounding
* It is recommendable to use the server
in a room where temperature can be
kept between 15 and 25ºC.
Wall outlet within
the reach of
supplied power
cord.
Uninterruptible Power Supply (UPS) to prevent
momentary voltage drop due to power failure or
lightning *
* Optional. UPS is recommended for best use of
features of NEC Express5800/ft series.
Close enough to
connect the keyboard
and the display.
Floor or a level
and robust
desk or table
Clean and tidy room
Location with an enough open
space to fully open the front bezel,
at least 1 m from the front, 50
cm .from the rear, and 15 cm from
the sides of the server (The front
bezel extrudes about 50 mm from
the right side of the server when
fully opened.)
Room that can maintain the
following conditions during server
operation:
Temperature: 10 to 35ºC*
Humidity: 20 to 80%
(non-condensing)