MRU GmbH
SWG 100 User Manual
Page
108
of
155
10.
Service and maintenance
For a reliable function and high measurement quality it is necessary to inspect and service the
analyzer regularly.
Besides the regular routine control by the operator (see chapter 10.1.-) the producer
recommends a regular half year maintenance, which must carried by a qualified specialist.
10.1.
Preparing and information about the maintenance
It is important to power off the mains supply before the maintenance can be started. Even if the
main fuse is powered off, dangerous voltage is present.
It can be required to cut off the electric supply and safe this from an accidental switch-on.
By maintenance works on the gas analyzer dangerous and toxic gases may leak. The gas
supply must be cut-off.
It is important to comply with the national directives, which are the country specific.
10.2.
Regular maintenance works by the operator
All inspections- and maintenance works are dependent from individual operating conditions,
and site. The specified intervals below are only benchmarks.
Review
Recommended
intervals
Actions
Moisture in the analyzer.
Weekly
Remove the moisture. Call vendor
specialist.
Dirt and depositions in analyzer.
Weekly
Remove the dirt, prevent further
penetration of dirt.
Inform vendor.
Dirt and moisture in the filter- unit
Weekly
Exchange the filter- unit.
Testing the gas pipes of leakage with
“sniffer”.
.
Weekly
Tighten or exchange the gas pipe if it
is necessary
Inspecting the conditions of the gas filters Every month
Exchange if is necessary
In the follow chapters there will be introduced some service parts, which are important for the
reliable operation. These parts are independent from the regular checks and must be replaced
in a regular interval of minimum 6 month.
Содержание SWG100 CEM
Страница 1: ...SWG100 User Manual MRU GmbH D 74172 Neckarsulm ...
Страница 2: ...MRU GmbH SWG 100 User Manual MRU GmbH D 74172 Neckarsulm 2 155 ...
Страница 98: ...MRU GmbH SWG 100 User Manual Page 98 of 155 Hardware state tests 1 2 3 4 5 6 7 8 9 2 3 4 5 6 7 8 9 1 ...
Страница 102: ......
Страница 135: ...MRU GmbH SWG 100 User Manual Page 135 of 155 13 3 Option O2 paramagnetic cell measurement 0 25 00 ...
Страница 142: ...MRU GmbH SWG 100 User Manual Page 142 of 155 13 10 Option NDIR bench for CO2 analysis 0 100 ...
Страница 154: ...MRU GmbH SWG 100 User Manual Page 154 of 155 14 Declaration of conformity ...
Страница 155: ...MRU GmbH SWG 100 User Manual Page 155 of 155 V1 00 EN ...