MRU GmbH
SWG 100 User Manual
Page
44
of
155
5.10.
Connection of main power supply
WARNING
Electrical shock!
Electricity could cause damage, injuries and even death! Only educated
staff should install the device.
The analyser needs a main power supply of
100-230 VAC/ 47-60 Hz
.
The power supply will be connected on the hat-rail.
Exactly:
•
L and N phase on the circuit breaker (
A
in sketch below).
•
PE on the connection terminal (
B
in sketch below.)
100-230 Vac/ 47-60 Hz/ 300W
N
L
PE
Position of the hat-rail. On the hat-rail can be found:
•
Main power supply.
•
I/O moduls (max. 10, 1 basic, all other optional)
•
H2 TCD (optional).
A
B
N
L
PE
Pre-fuse
Содержание SWG100 CEM
Страница 1: ...SWG100 User Manual MRU GmbH D 74172 Neckarsulm ...
Страница 2: ...MRU GmbH SWG 100 User Manual MRU GmbH D 74172 Neckarsulm 2 155 ...
Страница 98: ...MRU GmbH SWG 100 User Manual Page 98 of 155 Hardware state tests 1 2 3 4 5 6 7 8 9 2 3 4 5 6 7 8 9 1 ...
Страница 102: ......
Страница 135: ...MRU GmbH SWG 100 User Manual Page 135 of 155 13 3 Option O2 paramagnetic cell measurement 0 25 00 ...
Страница 142: ...MRU GmbH SWG 100 User Manual Page 142 of 155 13 10 Option NDIR bench for CO2 analysis 0 100 ...
Страница 154: ...MRU GmbH SWG 100 User Manual Page 154 of 155 14 Declaration of conformity ...
Страница 155: ...MRU GmbH SWG 100 User Manual Page 155 of 155 V1 00 EN ...